PRARANCANGAN PABRIK FATTY ALCOHOL DARI METIL ESTER DAN HIDROGEN DENGAN KAPASITAS PRODUKSI 400.000 TON/TAHUN | ELECTRONIC THESES AND DISSERTATION

Electronic Theses and Dissertation

Universitas Syiah Kuala

    SKRIPSI

PRARANCANGAN PABRIK FATTY ALCOHOL DARI METIL ESTER DAN HIDROGEN DENGAN KAPASITAS PRODUKSI 400.000 TON/TAHUN


Pengarang

HIDAYATULLAH AKBAR JAMAL - Personal Name;

Dosen Pembimbing

Azwar - 197005211998021001 - Dosen Pembimbing I
Syaubari - 196508041992031002 - Dosen Pembimbing II



Nomor Pokok Mahasiswa

1704103010080

Fakultas & Prodi

Fakultas Teknik / Teknik Kimia (S1) / PDDIKTI : 24201

Penerbit

Banda Aceh : Fakultas Teknik., 2021

Bahasa

Indonesia

No Classification

546.2

Literature Searching Service

Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)

ABSTRAK
Prarancangan pabrik fatty alcohol dengan menggunakan bahan baku metil ester dan hydrogen sebagai bahan baku. Proses produksi secara keseluruhan menggunakan proses kontinyu dengan melibatkan proses hidrogenasi dan purifikasi. Kapasitas produksi pabrik fatty alcohol ini adalah 400.000 ton per tahun dengan hari kerja 330 hari per tahun. Bentuk perusahana yang direncanakan adalah Perseroan Terbatas (PT) dengan menggunakan bentuk organisasi garis dan staf. Kebutuhan tenaga kerja untuk menjalankan perusahaan ini berjumlah 160 orang. Lokasi pabrik direcanakan didirikan di daerah Lubuk Gaung, Kecamatan Sungai Sembilan, Kota Dumai, Provinsi Riau dengan luas tanah 20.959 m2. Sumber air untuk pabrik fatty alcohol ini berasal dari Sungai Rokan Hulu.
Hasil Perhitungan analisa ekonomi adalah sebagai berikut :
1. Fixed Capital Investment (FCI) = Rp 408.437.905.451
2. Working Capital Investment (WCI) = Rp 45.381.989.483
3. Total Capital Investment (TCI) = Rp 453.819.894.434
4. Total Production Cost (TPC) = Rp 11.645.123.334.551
5. Sell Cost (SC) = Rp 11.892.812.873.730
6. Pay Out Time (POT) = Rp 3,38 Tahun
7. Break Event Point (BEP) = Rp 69%
8. Internal Rate of Return (IRR) = Rp35,28%
Berdasarkan studi teknis dan kelayakan teknis dan ekonomi diatas, maka dapat disiumpulkan bahwa pabrik perancangan Fatty Alcohol ini layak untuk dilanjutkan ketahap konstruksi.

ABSTRACT Fatty alcohol factory design using methyl ester and hydrogen as raw materials. The overall production process uses a continuous process involving hydrogenation and purification processes. The production capacity of this fatty alcohol factory is 400,000 tons per year with 330 working days per year. The planned form of the company is a Limited Liability Company (PT) using a line and staff organizational form. The need for manpower to run this company is 160 people. The location of the factory is planned to be established in the Lubuk Gaung area, Sungai Sembilan District, Dumai City, Riau Province with a land area of 20,959 m2. The water source for this fatty alcohol factory comes from the Rokan Hulu River. The results of the calculation of the economic analysis are as follows: 1. Fixed Capital Investment (FCI) = Rp 408.437.905.451 2. Working Capital Investment (WCI) = Rp 45.381.989.483 3. Total Capital Investment (TCI) = Rp 453.819.894.434 4. Total Production Cost (TPC) = Rp 11.645.123.334.551 5. Sell Cost (SC) = Rp 11.892.812.873.730 6. Pay Out Time (POT) = Rp 3,38 Years 7. Break Event Point (BEP) = Rp 69% 8. Internal Rate of Return (IRR) = Rp35,28% Based on the technical study and the technical and economic feasibility above, it can be concluded that the Fatty Alcohol design plant is feasible to proceed to the construction stage.